RINGWAY INFRASTRUCTURE SERVICES LIMITED
Salary
National Minimum Wage
Location
Hoe Lane Depot, Hoe Lane, Ware, Hertfordshire, SG13 7HY
Deadline
28 July 2026
Type
apprenticeship
Start date
1 September 2026
Duration
1 Year 6 Months
Positions
4 positions available
Working hours
Monday to Friday, between 8:00am and 6:00pm (Times may vary).
Training provider
SOUTH FARNHAM EDUCATIONAL TRUST
Standard (Level 2)
Highways maintenance skilled operative (level 2)
Entry Requirements
Subject-specific qualifications
| Subject | Type | Grade | Status |
|---|---|---|---|
| Working towards Level 1 Maths and English | Other | working towards Level 1 | Preferred |
Skills Required
What they're looking for
If you like the outdoors and practical work, see details. As part of a small team, you will carry out routine repairs and maintenance to the highway network: roads, footways, drains, signs, walls, fences, barriers, street furniture, grass verges etc. Assist with response to emergencies, incidents on the network, flooding, storms and other weather events.
Trust Signals
Use these cues to judge how complete and actionable this listing looks.
Use the AI Coach to ask follow-up questions about the employer, selection process, and what to prepare next.
Salary
National Minimum Wage
Location
Hoe Lane Depot, Hoe Lane, Ware, Hertfordshire, SG13 7HY
Deadline
28 July 2026
Type
apprenticeship
Start date
1 September 2026
Duration
1 Year 6 Months
Positions
4 positions available
Working hours
Monday to Friday, between 8:00am and 6:00pm (Times may vary).
Training provider
SOUTH FARNHAM EDUCATIONAL TRUST
Standard (Level 2)
Highways maintenance skilled operative (level 2)
Entry Requirements
Subject-specific qualifications
| Subject | Type | Grade | Status |
|---|---|---|---|
| Working towards Level 1 Maths and English | Other | working towards Level 1 | Preferred |
Skills Required
What they're looking for
If you like the outdoors and practical work, see details. As part of a small team, you will carry out routine repairs and maintenance to the highway network: roads, footways, drains, signs, walls, fences, barriers, street furniture, grass verges etc. Assist with response to emergencies, incidents on the network, flooding, storms and other weather events.
Trust Signals
Use these cues to judge how complete and actionable this listing looks.
Use the AI Coach to ask follow-up questions about the employer, selection process, and what to prepare next.